Pedestrian Bridge at East Exit of Shibuya Station in 2018 May: 2
The pedestrian bridge was being replaced gradually. The steps at the left edge of this photo was closed because the part above them had been already replaced.
153
views
0
faves
0
comments
Uploaded on May 29, 2019
Taken on April 8, 2018
Pedestrian Bridge at East Exit of Shibuya Station in 2018 May: 2
The pedestrian bridge was being replaced gradually. The steps at the left edge of this photo was closed because the part above them had been already replaced.
153
views
0
faves
0
comments
Uploaded on May 29, 2019
Taken on April 8, 2018