Back to album

Tunnel Entrance of Kishiya-Namamugi Route in 2017 March

The road opened in 2018 February at the same time as Shutoko (metropolitan expressway) K7. Namamugi Entrance/Exit of the expressway exists on the other side of the tunnel.

 

A photo taken in 2010 August is shown in “Tunnel Entrance of Kishiya-namamugi Route.” The right tunnel did not exist at that time.

 

106 views
0 faves
0 comments
Uploaded on May 27, 2019
Taken on March 19, 2017