Panel at Emergency Escape Path in Yokohama-kita Tunnel
It is interesting that the panel shows the whole part of the 5.9km long Yokohama-kita Tunnel. The tunnel has three ventilation systems and the escape path has a exist at each ventilation system.
107
views
0
faves
0
comments
Uploaded on March 23, 2019
Taken on March 11, 2017
Panel at Emergency Escape Path in Yokohama-kita Tunnel
It is interesting that the panel shows the whole part of the 5.9km long Yokohama-kita Tunnel. The tunnel has three ventilation systems and the escape path has a exist at each ventilation system.
107
views
0
faves
0
comments
Uploaded on March 23, 2019
Taken on March 11, 2017