Back to album

Bridge Replacement Work Began in Shimo-kitazawa at Midnight in 2018 February: 6

The ladder was being removed. The power line was pushed aside to open space to hoist old bridge pieces.

150 views
1 fave
0 comments
Uploaded on March 3, 2019
Taken on February 18, 2018