Bridge Replacement Work Began in Shimo-kitazawa at Midnight in 2018 February: 6
The ladder was being removed. The power line was pushed aside to open space to hoist old bridge pieces.
150
views
1
fave
0
comments
Uploaded on March 3, 2019
Taken on February 18, 2018
Bridge Replacement Work Began in Shimo-kitazawa at Midnight in 2018 February: 6
The ladder was being removed. The power line was pushed aside to open space to hoist old bridge pieces.
150
views
1
fave
0
comments
Uploaded on March 3, 2019
Taken on February 18, 2018