Odakyu 2000 Series Train and Road Detoured for Construction of Underground Flood Control Channel 6
The train took 14 seconds to move 160m. The speed was about 40km/h. The train was slowing down to stop at Noborito Station.
170
views
0
faves
0
comments
Uploaded on October 1, 2017
Taken on October 10, 2016
Odakyu 2000 Series Train and Road Detoured for Construction of Underground Flood Control Channel 6
The train took 14 seconds to move 160m. The speed was about 40km/h. The train was slowing down to stop at Noborito Station.
170
views
0
faves
0
comments
Uploaded on October 1, 2017
Taken on October 10, 2016