Odakyu 2000 Series Train and Road Detoured for Construction of Underground Flood Control Channel 2
The detoured section was about 150m long.
130
views
0
faves
0
comments
Uploaded on September 19, 2017
Taken on October 10, 2016
Odakyu 2000 Series Train and Road Detoured for Construction of Underground Flood Control Channel 2
The detoured section was about 150m long.
130
views
0
faves
0
comments
Uploaded on September 19, 2017
Taken on October 10, 2016