800t Crane on Ohashi Junction Construction Site
The construction of Ohashi Junction entered the final year. Now the ramps connecting the entrance of the tunnel and Shibuya Line are being built.
As the construction of bridges in the port of Tokyo, they manufacture segments of the road in a factory, then put it on the support with a crane. It minimizes the closing time of the traffic.
So, they brought an 800t crawler crane. It is not as large as the floating cranes, but you can come closer.
800t Crane on Ohashi Junction Construction Site
The construction of Ohashi Junction entered the final year. Now the ramps connecting the entrance of the tunnel and Shibuya Line are being built.
As the construction of bridges in the port of Tokyo, they manufacture segments of the road in a factory, then put it on the support with a crane. It minimizes the closing time of the traffic.
So, they brought an 800t crawler crane. It is not as large as the floating cranes, but you can come closer.