JR Keihin-tohoku Line E233 Series Train and Apartment Building under Construction beside Kotake Crossing 2
This photo was taken in 2016 September. The building on the other side of the track was scheduled to be completed in early 2017. The view should be different now.
149
views
0
faves
0
comments
Uploaded on March 26, 2017
Taken on September 3, 2016
JR Keihin-tohoku Line E233 Series Train and Apartment Building under Construction beside Kotake Crossing 2
This photo was taken in 2016 September. The building on the other side of the track was scheduled to be completed in early 2017. The view should be different now.
149
views
0
faves
0
comments
Uploaded on March 26, 2017
Taken on September 3, 2016