Tobu Tojo Line 30000 Series Train and Ventilation System of Ring Road No.8 Kitamachi-Wakagi Tunnel 2
I see red lights of railroad crossing ahead. Currently, grade separation plan of Tobu Tojo Line does not include this section. The railroad crossing may remains for long time.
131
views
0
faves
0
comments
Uploaded on March 11, 2017
Taken on May 22, 2016
Tobu Tojo Line 30000 Series Train and Ventilation System of Ring Road No.8 Kitamachi-Wakagi Tunnel 2
I see red lights of railroad crossing ahead. Currently, grade separation plan of Tobu Tojo Line does not include this section. The railroad crossing may remains for long time.
131
views
0
faves
0
comments
Uploaded on March 11, 2017
Taken on May 22, 2016