Back to album

Construction Site beside Kanagawa Prefectural Road Route 111: 3

Ground reinforcement work was under way. Those piles are very close to the houses. When the work would be done, the road below would be widened.

155 views
0 faves
0 comments
Uploaded on November 9, 2017
Taken on October 30, 2016