The Yagami River beside Kajigaya Freight Terminal in 2017 February
Taken at the north side of Kajigaya Frieght Terminal. Another photo taken at this spot in 2016 March is shown in “Improvement Work of the Yagami River beside Kajigaya Freight Terminal.”
Two projects are under way at this area: one is underground flood control reservoir of the Yagami River, and the other is tunnel construction of Chuo Shinkansen. I do not know which work is related to the work shown in this photo.
The Yagami River beside Kajigaya Freight Terminal in 2017 February
Taken at the north side of Kajigaya Frieght Terminal. Another photo taken at this spot in 2016 March is shown in “Improvement Work of the Yagami River beside Kajigaya Freight Terminal.”
Two projects are under way at this area: one is underground flood control reservoir of the Yagami River, and the other is tunnel construction of Chuo Shinkansen. I do not know which work is related to the work shown in this photo.