New South End of Yamate Tunnel
Shutoko (metropolitan expressway) Central Circular Shinagawa Route was opened on 2015 March 7th. This photo was taken one day after the opening.
Most part of the newly built expressway is under the ground. This is the south end of the tunnel. The road sign over the entrance says that the tunnel is 18600m long.
Two stacks are shown in this photo. The gray one is the stack of Shinagawa Incineration Plant, and the white one is Shinagawa Thermal Power Plant of Tokyo Electric Power Corporation.
New South End of Yamate Tunnel
Shutoko (metropolitan expressway) Central Circular Shinagawa Route was opened on 2015 March 7th. This photo was taken one day after the opening.
Most part of the newly built expressway is under the ground. This is the south end of the tunnel. The road sign over the entrance says that the tunnel is 18600m long.
Two stacks are shown in this photo. The gray one is the stack of Shinagawa Incineration Plant, and the white one is Shinagawa Thermal Power Plant of Tokyo Electric Power Corporation.