Back to album

Route 246 and Shutoko No.3 in Front of Ohashi Junction in 2013 April: 2

Another photo taken on O-path Bridge, which is shown in “New Pedestrian Bridge over Route 246”

 

It seems that the position of the column at the other side of the road is staggered to avoid the pedestrian bridge.

278 views
0 faves
0 comments
Uploaded on April 30, 2014
Taken on April 14, 2013