Back to photostream

Beginning of Interior

Kitchen and Tortury Room are finished. 9V Motor has to be covered and a small cave in the right corner at the bottom has to be built.

340 views
0 faves
0 comments
Uploaded on September 5, 2008
Taken on September 5, 2008