Tom B
tominsouthfl
Shower remodel taken 09-12-09
90% done shower remodel. Adding fixtures and waiting for caulk to dry. Its a pre made surround shower with water resistant wainscoting framing.
3,063
views
0
faves
0
comments
Uploaded on September 12, 2009
Taken on January 7, 2002
Shower remodel taken 09-12-09
90% done shower remodel. Adding fixtures and waiting for caulk to dry. Its a pre made surround shower with water resistant wainscoting framing.
3,063
views
0
faves
0
comments
Uploaded on September 12, 2009
Taken on January 7, 2002