Back to photostream

Pedestrian Bridge

Construction works of the pedestrian bridge linking the Merlion Park to the middle of the Esplanade Bridge and the Esplanade are in progress. The pedestrian bridge is 6m wide, 220m long and curved is scheduled to be completed in 2015.

1,775 views
2 faves
1 comment
Uploaded on September 19, 2013
Taken on September 13, 2013