sonnysawyer43
STRUCTURAL FAILURE
Last night there must have been a freak wind from the east (Irene..?,).in that two of the four bamboo pole bean supports this morning were flat on the ground .Foresicic investigations have indicated that the design engineer made a major boot in his calculations and four of the duct tape joints failed simultaneously. Repair alternatives are presently being studied (BY SAME REPROBATE ENGINEER) and remedial construction is due later this week.
STRUCTURAL FAILURE
Last night there must have been a freak wind from the east (Irene..?,).in that two of the four bamboo pole bean supports this morning were flat on the ground .Foresicic investigations have indicated that the design engineer made a major boot in his calculations and four of the duct tape joints failed simultaneously. Repair alternatives are presently being studied (BY SAME REPROBATE ENGINEER) and remedial construction is due later this week.