rcmickel
rcmickel
Solar Panel Installation - Day 3
Day 3, October 1, 2013. After the VersaBrackets were installed on the two lower shed roofs on Day 2, the crew began Day 3 by installing rails to those brackets.
163
views
0
faves
0
comments
Uploaded on October 10, 2013
Taken on October 1, 2013
Solar Panel Installation - Day 3
Day 3, October 1, 2013. After the VersaBrackets were installed on the two lower shed roofs on Day 2, the crew began Day 3 by installing rails to those brackets.
163
views
0
faves
0
comments
Uploaded on October 10, 2013
Taken on October 1, 2013