Solar Panel Installation - Day 4
Day 4, October 2, 2013. The conduit is being directed to this area behind the garage where all of the electrical resides. Final wiring will be the last act of the installation. The box on the left is the original main circuit breaker for the house; the box to the right of it is the manual cut-off switch; the box to the right of the cut-off switch is a sub-panel to handle the power from the solar panels and the box on the extreme right is the inverter that converts the direct current (DC) from the solar panels to alternating current (AC) that is used by the house.
Solar Panel Installation - Day 4
Day 4, October 2, 2013. The conduit is being directed to this area behind the garage where all of the electrical resides. Final wiring will be the last act of the installation. The box on the left is the original main circuit breaker for the house; the box to the right of it is the manual cut-off switch; the box to the right of the cut-off switch is a sub-panel to handle the power from the solar panels and the box on the extreme right is the inverter that converts the direct current (DC) from the solar panels to alternating current (AC) that is used by the house.