Solar Panel Installation - Day 4
Day 4, October 2, 2013. Electrical conduit is also being installed on the lower shed roofs to route the wiring from the solar panels that will have micro-inverters installed. NOTE: micro-inverters are attached to individual solar panels and convert the DC to AC which is then transmitted to the breaker box on the back of the garage.
932
views
0
faves
0
comments
Uploaded on October 3, 2013
Taken on October 2, 2013
Solar Panel Installation - Day 4
Day 4, October 2, 2013. Electrical conduit is also being installed on the lower shed roofs to route the wiring from the solar panels that will have micro-inverters installed. NOTE: micro-inverters are attached to individual solar panels and convert the DC to AC which is then transmitted to the breaker box on the back of the garage.