Kenneth-V
Panavia Tornado ECR - Tigermeet 2001 - 3
The overall build (from scratch to this) took me about 4 months, 3 of which were spent on the stickers. I wanted them to be as detailed as possible, while keeping the working features, such as the expandable refueling receptacle, opening cockpit canopy, working variable geometry wings, working air brakes and thrust reversers and of course the retractable undercarriage, intact.
It was the refueling receptacle that gave me the most issues while decalling and took quite the steady hand.
Panavia Tornado ECR - Tigermeet 2001 - 3
The overall build (from scratch to this) took me about 4 months, 3 of which were spent on the stickers. I wanted them to be as detailed as possible, while keeping the working features, such as the expandable refueling receptacle, opening cockpit canopy, working variable geometry wings, working air brakes and thrust reversers and of course the retractable undercarriage, intact.
It was the refueling receptacle that gave me the most issues while decalling and took quite the steady hand.