Sixty Sandwich
President's Day 2021 edition of the BNSF Pasadena Road Switcher heads west through Upland, California. Power today is two GP60M's (122/140) spliced by two GP60's (190/169). Twelve loads in tow for 1400 tons, including four car loads of 70' stick rail for the Gold Line Construction Authority in Pomona. Will most likely be used in the rebuilding of the former SFe 2nd District along the new Gold Line extension between Pomona and Covina. Service to Irwindale not expected until at least May. Stay tuned...
Sixty Sandwich
President's Day 2021 edition of the BNSF Pasadena Road Switcher heads west through Upland, California. Power today is two GP60M's (122/140) spliced by two GP60's (190/169). Twelve loads in tow for 1400 tons, including four car loads of 70' stick rail for the Gold Line Construction Authority in Pomona. Will most likely be used in the rebuilding of the former SFe 2nd District along the new Gold Line extension between Pomona and Covina. Service to Irwindale not expected until at least May. Stay tuned...