Back to photostream

Unlocked

All is quiet at Goring Lock on a cold and sunny December day. The lock was first built in 1787 by the Thames Navigation Commissioners. The last rebuild of the lock was in 1921.

644 views
8 faves
0 comments
Uploaded on December 3, 2019