Back to photostream

Cocoa Beach Jr/Sr High School

Starmer Ranaldi Planning and Architecture, Inc. (sri) is pleased to provide architectural design services for Cocoa Beach Jr. Sr. High School. Our design will include comprehensive refurbishment to correct life safety and ADA code deficiencies, add new student-centered instructional space for the student population, and upgrades to all outdated and/or aging infrastructure and building systems to current Brevard Public School Standards.

 

The safety of students is a primary concern of sri. Since the campus will be occupied during construction phasing, we will be effectively communicating the conceptual design intent to district/school staff, parents, students, and our consultants so that quality learning environments and life safety standards are maximized.

 

The renovations and additions to Cocoa Beach Jr/Sr. High School will include: a 4,800 square foot addition to Building 1, which will house an Administrative Center with a covered walkway; and the renovation and expansion of the Media Center to support new Computer Labs, expanded AV storage, and joint-use Conference Room. The 13,000 square foot of remodeling will support two Computer Labs, weight training facilities, locker rooms, and sports training facilities. Additionally, remodeling and modifications will accommodate the ROTC program, Wrestling Room, Girls Locker Rooms, Team Locker Space, P.E. Locker Space, Coaches Offices, Training Room, and ADA compliant Shower and Restroom facilities, Teacher Planning, Concessions, and male restroom. All buildings will receive full data and instructional technology, fire and sprinkler, electrical, HVAC, and ADA Code Compliance upgrades and enhancements.

 

Specially, major project scope and work include:

 

BUILDING 1 (A) – Administration and Media

1.Renovation of existing Administration Area

2.Renovation of existing Information Technology/Main Distribution Frame

3.Addition to Administrative Suite

 

BUILDING 3 (C) – Classroom Pod

1.Renovation of existing Art Classroom, teacher planning area, custodial storage, concessions, and male-group restrooms to support a wrestling room, enlarged concession stand, enlarged male-group restroom, and teacher planning area with restrooms facilities.

2.Renovation of existing female restroom to support new custodial office and storage space.

 

BUILDING 4 (D) – Classroom Pod

1.Addition to existing weight Room.

2.Renovation of existing restroom off weight Room.

3.Renovation of existing Drama Classroom to support a Business Technology Education Lab.

 

 

 

BUILDING 6 (F) – Music & Female Locker Room

1.Renovation of joint group male/female restroom to support a male-group restroom.

2.Renovation of existing female locker room and wrestling room area to support an enlarged group-female restroom, female P.E. locker room, female P.E. coaches’ office, related ADA-compliant female toilet and shower facilities, varsity female locker room, and training room.

 

BUILDING 8 (H) – Kitchen, Dining & Male Locker Room

1.Renovation of existing male coaches’ offices and shower/toilet room area to support enlarged male P.E. coaches’ offices and ADA-compliant male toilet and shower facilities, varsity female locker room, and training room.

 

STADIUM

1.Existing concession stand/ticket booth, press box, and irrigation pump building proposed to be demolished.

2.New concession stand and press box will be constructed.

3.Accessible seating platform will be added to existing home side bleachers.

 

5,928 views
2 faves
0 comments
Uploaded on April 17, 2008
Taken on April 2, 2008