Assembling wind turbine towers | Siemens | Alexandra Dock | 20th Jan 2025
9000 tonne heavylift ship Grietje is the little boat to the left.
174
views
3
faves
0
comments
Uploaded on January 20, 2025
Taken on January 20, 2025
Assembling wind turbine towers | Siemens | Alexandra Dock | 20th Jan 2025
9000 tonne heavylift ship Grietje is the little boat to the left.
174
views
3
faves
0
comments
Uploaded on January 20, 2025
Taken on January 20, 2025