WPTO Image Gallery
Water Power Technologies Office (WPTO)
Workers Replace Turbines with Rotor Housing Three Thermoplastic Blades
May 5, 2021 - In May 2021, Verdant Power performed a retrieve-and-replace operation during which one of the turbines will be replaced with a rotor housing three thermoplastic blades manufactured by NREL. (Photo By Paul Komosinski)
[64529]
16,979
views
0
faves
0
comments
Uploaded on August 11, 2022
Taken on May 5, 2021
Workers Replace Turbines with Rotor Housing Three Thermoplastic Blades
May 5, 2021 - In May 2021, Verdant Power performed a retrieve-and-replace operation during which one of the turbines will be replaced with a rotor housing three thermoplastic blades manufactured by NREL. (Photo By Paul Komosinski)
[64529]
16,979
views
0
faves
0
comments
Uploaded on August 11, 2022
Taken on May 5, 2021