Back to photostream

Tartigou river relocation

Building the Intercolonial Railway back in the 1860s and 1870s was not for the faint of heart. ICR Chief Engineer Sanford Fleming endured more than a decade of engineering challenges in order to link Halifax with the western markets of Quebec City and Montreal.

A few site were more complicated than others like this one, located a mile and a half west of St.Noël, Fleming, in order to save the cost of building a bridge over Tartigou River, had it's construction crew bore a tunnel thru the rock in order to reroute the river away from the not yet constructed roadbed.

 

Talk about ingenuity !

 

The rock debris, issued when ICR crews pierced the roadbed thru the same rock cut, was used to stabilize the embankment along with keeping an acceptable rolling grade.

 

I made the walk -in heavy rain no less- from St.Noël to the tunnel on a cold autumn day, hoping to catch Campbellton-bound L562 passing the site of one of Fleming's legacy.

 

CN L56221-21

2294 8845

Milepost 85.6 Mont-Joli subdivision

St.Noël,QC

October 21st 2025

 

 

5,788 views
194 faves
21 comments
Uploaded on November 3, 2025