foosaintbeast
Meet at Tacheeda
After sitting in the hole at Tacheeda for a local and a coal train from the Tumbler, 473 meets their final train of the day that being the counterpart manifest train 472. This was the location where CN swapped diesels for the BCRail electrics for the journey to Tumbler Ridge, hence the overhead catenary. I calculated how long 472 would take to get to the siding on the way here, I was 2 minutes off.
Meet at Tacheeda
After sitting in the hole at Tacheeda for a local and a coal train from the Tumbler, 473 meets their final train of the day that being the counterpart manifest train 472. This was the location where CN swapped diesels for the BCRail electrics for the journey to Tumbler Ridge, hence the overhead catenary. I calculated how long 472 would take to get to the siding on the way here, I was 2 minutes off.