Tracking West
Tracking West
Grabbing More Loads
After dropping off a cut of loaded centerbeams, Quincy 12 makes its way down the steep hill that connects the UP interchange to the American Valley. After getting to the bottom of the hill, the crew would take another cut or two of loads to the interchange before heading back to the Sierra Pacific facility in East Quincy to tie down for the day.
2,579
views
70
faves
6
comments
Uploaded on May 17, 2023
Taken on November 21, 2022
Grabbing More Loads
After dropping off a cut of loaded centerbeams, Quincy 12 makes its way down the steep hill that connects the UP interchange to the American Valley. After getting to the bottom of the hill, the crew would take another cut or two of loads to the interchange before heading back to the Sierra Pacific facility in East Quincy to tie down for the day.
2,579
views
70
faves
6
comments
Uploaded on May 17, 2023
Taken on November 21, 2022