Back to photostream

KBS 704 @ Talbot

After dropping half of their train at the split in Templeton, KBS takes the first split to the Stewart grain mill for loading, passing a ripped up siding and a windmill in the middle of a cornfield (8/1/22).

859 views
26 faves
1 comment
Uploaded on August 8, 2022
Taken on August 1, 2022