Back to album

Spink Hill Signal Box Track Diagram

I visited this box on 1 September 1966. I visited 7 boxes that day, see my "boxes visited" log pages

www.flickr.com/photos/192151030@N08/51603033999/in/album-...

www.flickr.com/photos/192151030@N08/51601553327/in/album-...

 

Dates as I know....

16 August 1898 - Box opened, which is before the line opening date of 21 September 1898.

 

9 January 1967 - Became the end of the line (buffers at tunnel mouth) after the Ministry of Transport paid for a chord line to connect the LDECR at Langwith Colliery Jn to MR line at Norwood Crossing so that they didn't have to build a bridge during the construction of the M1 Motorway. A drawing of the terminus layout is here www.flickr.com/photos/192151030@N08/52463500037/in/album-...

 

3 August 1968 - Box closed, line singled from Beighton Junction, one train working. The diagram for that can be seen here www.flickr.com/photos/192151030@N08/51685849816/in/album-...

 

In 1984 Westthorpe Colliery closed and then the line from Beighton Junction to Spink Hill closed, apart from a short section at Beighton which was used as a run-round loop and reversing siding (Information from p 113 of Chris Booth's book "The Lancashire Derbyshire and East Coast Railway Vol 1").

 

My external photo of the box is here www.flickr.com/photos/192151030@N08/52464004591/in/album-...

 

Another photo of the box can be seen here

www.flickr.com/photos/29644579@N07/6024635279

 

The Sectional Appendix pages are here

www.flickr.com/photos/192151030@N08/51939366556/in/datepo...

www.flickr.com/photos/192151030@N08/51681788815/in/photos...

 

The quite accurate location of the box was 445605 (Easting) 379186 (Northing), seen here on the NLS maps maps.nls.uk/geo/explore/side-by-side/#zoom=16.0&lat=5...

 

A more detailed 25 inch to the mile map is here maps.nls.uk/geo/explore/side-by-side/#zoom=16.0&lat=5...

This shows the railway under construction.

1,028 views
3 faves
0 comments
Uploaded on October 30, 2022