Annesley No.3_1963
This box worked to both No. 4 box and Annesley North Junction box in the Down direction using bells only. It controlled the Down arrival lines, the down Engine Line and the Down departure lines. It had a 22 lever frame with 3 spare and 4 shoes.
The diagram has been reproduced with the kind permission of Owen Llewellyn who retains the Copyright.
427
views
3
faves
0
comments
Uploaded on March 2, 2021
Annesley No.3_1963
This box worked to both No. 4 box and Annesley North Junction box in the Down direction using bells only. It controlled the Down arrival lines, the down Engine Line and the Down departure lines. It had a 22 lever frame with 3 spare and 4 shoes.
The diagram has been reproduced with the kind permission of Owen Llewellyn who retains the Copyright.
427
views
3
faves
0
comments
Uploaded on March 2, 2021