Back to photostream

Pool power

The Grafton & Upton local pulls west on the Keolis Milford Running Track to clear the G&U switch and enter home rails at Milford, MA. In addition to empties from Bluelinx & Garelick Farms, they also had MBTA F40PH-3C #1074 in their consist, destined for some repair work at the G&U enginehouse.

 

The 1074 had been delivered to the Bluelinx siding for pickup by the G&U by the Keolis power wash job, which had run out the Franklin Branch from Readville earlier.

 

A few.weeks previously, an extra had delivered F40PH-3C #1057 to the G&U for similar work via the B&A at N. Grafton.

 

The G&U had taken over servicing those consignees from CSX in the recent past. The CSX era typically saw GP40-2s here. In the Conrail years, 9500s (SW1500s) would occasionally break up the steady diet of B23-7s and GP15-1s here.

 

November 19, 2021

1,549 views
19 faves
2 comments
Uploaded on December 23, 2021
Taken on November 19, 2021