f.r.jamko
TC 1011, Steam 0-6-0T as a loco to pull train in Indonesia Miniature land,Jakarta.
I am afraid with the condition when visit there. That locomotive was placed in outside without canopy, and it is resistance to get rust/porous.
In the past, this locomotive was operated by Staatsspoorwegen company for narrow gauge railway (600mm).
The route
West Java province :
1.Cilamaya-Cikampek, length 28 km, finished at year 1909.
2.Cikampek-Wadas, length 16 km, finished at year 1912.
3.Karawang-Rengasdengklok, length 21 km, finished at year 1919.
4.Karawang-Wadas, length 15 km, finished at year 1920.
East Java province :
1.Rambupuji-Balung-Puger, length 28 km, finished at year 1913.
2.Balung-Ambulu, length 12 km, finished at year 1913.
This locomotive was used for pull the mixed train which consist freight, and passenger wagon. At year 1929, the route of Rambupuji-Balung-Puger were changed with 1067 mm gauge, only in Rambupuji-Balung railway route. This route are connected with the railway route Limajang-Kencong-Balong (length 42km, finished at year 1928).
TC 1011, Steam 0-6-0T as a loco to pull train in Indonesia Miniature land,Jakarta.
I am afraid with the condition when visit there. That locomotive was placed in outside without canopy, and it is resistance to get rust/porous.
In the past, this locomotive was operated by Staatsspoorwegen company for narrow gauge railway (600mm).
The route
West Java province :
1.Cilamaya-Cikampek, length 28 km, finished at year 1909.
2.Cikampek-Wadas, length 16 km, finished at year 1912.
3.Karawang-Rengasdengklok, length 21 km, finished at year 1919.
4.Karawang-Wadas, length 15 km, finished at year 1920.
East Java province :
1.Rambupuji-Balung-Puger, length 28 km, finished at year 1913.
2.Balung-Ambulu, length 12 km, finished at year 1913.
This locomotive was used for pull the mixed train which consist freight, and passenger wagon. At year 1929, the route of Rambupuji-Balung-Puger were changed with 1067 mm gauge, only in Rambupuji-Balung railway route. This route are connected with the railway route Limajang-Kencong-Balong (length 42km, finished at year 1928).