Wind Enterprise of Aarhus, Denmark
Wind Enterprise in Gt. Yarmouth's outer harbour before leaving for the Veja Mate OWF. She is a wind turbine service and crane vessel with a maximum carrying capacity of 4 turbines.
Name: Wind Enterprise
Vessel type: Jack-up vessel
Design: 1A1 class
Home port: Aarhus
Flag: Denmark
IMO: 9578244
MMSI: 219370000
Call sign: OZTU2
Length overall: 120.77 m
Beam: 40.08 m
Draught: 4.5 m
Gross tonnage: 11,730 tons
Net tonnage: 3,519 tons
Deadweight: 6,315 tons
Propulsion: Diesel-electric
Power plants:
5 x MTU 16V 4000M43S
1 x MTU 12V 4000P83
Total power output: 2,119 hp (1,580kW)
Transit speed: 7 knots
Year built: 2011
Owner: Ziton A/S, Horsens, Denmark
Previous names:
MPI Enterprise until 19th.April 2020
Victoria Mathias until 11th. October 2013
Seabreeze 1 until 1st. December 2011
COLLISION IN BREMERHAVEN.
At 4.10 p.m on 29th. September 2016, the German dredger Hegemann 4 collided with MPI Enterprise, which was berthed at the Strom Quay in Bremerhaven. The dredger was working off the quay when it hit the fore ship of MPI Enterpriese with its stern causing a 12 in. (30 cm) breach in the hull. The dredger suffered damage to it's superstructure and a railing but was able to continue working.
Wind Enterprise of Aarhus, Denmark
Wind Enterprise in Gt. Yarmouth's outer harbour before leaving for the Veja Mate OWF. She is a wind turbine service and crane vessel with a maximum carrying capacity of 4 turbines.
Name: Wind Enterprise
Vessel type: Jack-up vessel
Design: 1A1 class
Home port: Aarhus
Flag: Denmark
IMO: 9578244
MMSI: 219370000
Call sign: OZTU2
Length overall: 120.77 m
Beam: 40.08 m
Draught: 4.5 m
Gross tonnage: 11,730 tons
Net tonnage: 3,519 tons
Deadweight: 6,315 tons
Propulsion: Diesel-electric
Power plants:
5 x MTU 16V 4000M43S
1 x MTU 12V 4000P83
Total power output: 2,119 hp (1,580kW)
Transit speed: 7 knots
Year built: 2011
Owner: Ziton A/S, Horsens, Denmark
Previous names:
MPI Enterprise until 19th.April 2020
Victoria Mathias until 11th. October 2013
Seabreeze 1 until 1st. December 2011
COLLISION IN BREMERHAVEN.
At 4.10 p.m on 29th. September 2016, the German dredger Hegemann 4 collided with MPI Enterprise, which was berthed at the Strom Quay in Bremerhaven. The dredger was working off the quay when it hit the fore ship of MPI Enterpriese with its stern causing a 12 in. (30 cm) breach in the hull. The dredger suffered damage to it's superstructure and a railing but was able to continue working.