Timing is Everything

I was set up at Adolph for an arriving Unitac (U-717) load and what should pass me headed north but a Minntac CN/BNSF Allouez shuttle train (U-779). I wondered if I would luck out and get the DPU passing by the Utac power and sure enough the rolling meet was executed perfectly under the signal bridge.

886 views
5 faves
3 comments
Uploaded on February 18, 2012
Taken on February 18, 2012