Slip-Out
All the rain we have received appears to have caused a slip-out of the new grade at control point Gary. This is near the same spot where a slip-out occurred when they were building the new alignment. CN 2131 was the power and MOW used Missabe side-dumps filled with rip-rap that was loaded at Steelton yard.
2,519
views
23
faves
3
comments
Uploaded on October 17, 2018
Taken on October 16, 2018
Slip-Out
All the rain we have received appears to have caused a slip-out of the new grade at control point Gary. This is near the same spot where a slip-out occurred when they were building the new alignment. CN 2131 was the power and MOW used Missabe side-dumps filled with rip-rap that was loaded at Steelton yard.
2,519
views
23
faves
3
comments
Uploaded on October 17, 2018
Taken on October 16, 2018