Matched Power Sets
All EMD at Proctor as a U717 load from UTAC arrives behind three IC SD40-3s while a Minntac load behind three tunnel motors (403 leading) is tied down on the scale track. On the left are DMIR SD38-2s 211 and 212 working the E Lead job. The shipping season hiatus (mid-January through March) is a good time to shoot ore at Proctor as CN likes to shift some Minntac production to Lakehead in order to take stockpile pressure off Two Harbors.
Matched Power Sets
All EMD at Proctor as a U717 load from UTAC arrives behind three IC SD40-3s while a Minntac load behind three tunnel motors (403 leading) is tied down on the scale track. On the left are DMIR SD38-2s 211 and 212 working the E Lead job. The shipping season hiatus (mid-January through March) is a good time to shoot ore at Proctor as CN likes to shift some Minntac production to Lakehead in order to take stockpile pressure off Two Harbors.