Highland Meet
A loaded train behind a traditional trio of SD38s meets an empty behind two new SD40-3s. Soon all trains on the Iron Range Division would be powered by pairs of tunnel motors. Today CN uses four units to get ore trains over the Iron Range Sub, although train length has increased from 116 cars to around 145.
2,013
views
38
faves
8
comments
Uploaded on June 19, 2016
Taken on March 29, 1997
Highland Meet
A loaded train behind a traditional trio of SD38s meets an empty behind two new SD40-3s. Soon all trains on the Iron Range Division would be powered by pairs of tunnel motors. Today CN uses four units to get ore trains over the Iron Range Sub, although train length has increased from 116 cars to around 145.
2,013
views
38
faves
8
comments
Uploaded on June 19, 2016
Taken on March 29, 1997