cleanout pipe4

This is the 3rd hole the plumber put into the wall, in search of the elusive pipe. (this one was done with a hammer-nice job bucko) He was supposed to put a cleanout drain 1/2 way up the vertical pipe-he instead pulled the middle piece out until it was cleaned oput, and then put it back in place

46 views
0 faves
0 comments
Uploaded on February 14, 2008
Taken on February 13, 2008