Northlandz
conrtol room
A glimpse into our control room! We have about 97 sections of track, each controlled by its own tranformer, which takes the electricity from the building and reduces it to the number of volts needed to power the trains. We turn the levers about an hour in advance to make sure all the trains are up and running when Northlandz opens up for the day!
908 782 4288
495 US-202, Flemington, NJ 08822
conrtol room
A glimpse into our control room! We have about 97 sections of track, each controlled by its own tranformer, which takes the electricity from the building and reduces it to the number of volts needed to power the trains. We turn the levers about an hour in advance to make sure all the trains are up and running when Northlandz opens up for the day!
908 782 4288
495 US-202, Flemington, NJ 08822