Back to photostream

G29 TGW

The purpose of the visit at Ensignbus was to get a MOT retest on our DT29 G29 TGW. She waits a slot into the testing area as a down Eurostar rushes past. Friday 8th September 2023. DSCN56935.

 

Barring any calamity DT29's next outing will be at the Metrobus garage open and running day on Saturday 23rd September.

 

Dennis Dart - Carlyle Dartline 8.5m.

780 views
12 faves
0 comments
Uploaded on September 8, 2023
Taken on September 8, 2023