Back to photostream

Shiptember 2020 WIP 2

Finished both sides! This one took a bit longer since I used most of my red tiles for the first WIP 1.

 

Onto the interior structure!

 

✌️

 

(Sorry about the bad lighting)

7,295 views
83 faves
14 comments
Uploaded on September 12, 2020
Taken on September 11, 2020