Back to photostream

Porthcawl dock 24-9-13.

Work progress,a closer view,to the right of the gate they are working on the sluice gate, to control the flow of water,there is also one on the left,of the lock gate.

489 views
1 fave
0 comments
Uploaded on September 24, 2013
Taken on September 24, 2013