New Alignment at Eureka
As part of a construction project to widen the road that passes beneath the middle of the junction, new bridges and new alignments are being built at Eureka in west Houston.
Here, soon after this new alignment's opening, the eastbound Sunset Limited rolls across new bridge and new track as it takes the big turn at Eureka on its way to an early arrival at the Houston Amtrak station. The old bridge is to the left of the train, partially behind the ballast pile.
AMT2 03 (EB Sunset Limited)
AMTK P42DC #151
AMTK P42DC #78
Houston, TX
April 5th, 2024
New Alignment at Eureka
As part of a construction project to widen the road that passes beneath the middle of the junction, new bridges and new alignments are being built at Eureka in west Houston.
Here, soon after this new alignment's opening, the eastbound Sunset Limited rolls across new bridge and new track as it takes the big turn at Eureka on its way to an early arrival at the Houston Amtrak station. The old bridge is to the left of the train, partially behind the ballast pile.
AMT2 03 (EB Sunset Limited)
AMTK P42DC #151
AMTK P42DC #78
Houston, TX
April 5th, 2024