MILW Alloy, MT
Train #263 sits in the siding on the west side of Butte waiting for its counterpart at the end of the day. Track in the foreground is the BA&P's mainline.
Earlier in the day, failed E73 was picked up at Three Forks along with the Gallatin Valley branch power 635. Both are headed for Deer Lodge. E73 to be added to the growing deadline and 635 for servicing.
Fifteen days to the end of electrification.
E21 E78 4005 19 E73 635
06-01-74
MILW Alloy, MT
Train #263 sits in the siding on the west side of Butte waiting for its counterpart at the end of the day. Track in the foreground is the BA&P's mainline.
Earlier in the day, failed E73 was picked up at Three Forks along with the Gallatin Valley branch power 635. Both are headed for Deer Lodge. E73 to be added to the growing deadline and 635 for servicing.
Fifteen days to the end of electrification.
E21 E78 4005 19 E73 635
06-01-74