Aligning the Switch at the Wye
Entering the east leg of the wye, the crew descends to throw the switch and handle the traffic control at the road crossings. Wind and rain are keeping things interesting.
211
views
1
fave
0
comments
Uploaded on October 21, 2019
Taken on September 11, 2019
Aligning the Switch at the Wye
Entering the east leg of the wye, the crew descends to throw the switch and handle the traffic control at the road crossings. Wind and rain are keeping things interesting.
211
views
1
fave
0
comments
Uploaded on October 21, 2019
Taken on September 11, 2019