B33-100-237
Yakima Project, Cle Elum Dam, WA.
Reclamation has begun constructing the secant pile vault in preparation for the helix juvenile downstream passage structure. 7/10/2017 BOR Footage by Kirsten Strough
4/26/2017 BOR Photo by Kirsten Strough
69
views
0
faves
0
comments
Uploaded on March 17, 2020
Taken on April 26, 2017
B33-100-237
Yakima Project, Cle Elum Dam, WA.
Reclamation has begun constructing the secant pile vault in preparation for the helix juvenile downstream passage structure. 7/10/2017 BOR Footage by Kirsten Strough
4/26/2017 BOR Photo by Kirsten Strough
69
views
0
faves
0
comments
Uploaded on March 17, 2020
Taken on April 26, 2017