B33-100-286
Yakima Project.
Construction worker digs with a shovel inside the secant at Cle Elum Dam. The secant is a very large oval-shaped hole that is stabilized by a concrete wall. It is being built in preparation to construct the Helix Fish Passage structure. The Yakima Basin Integrated Plan, which is a model for cooperative and sustainable water management in an area with shifting hydrologic conditions (more rain instead of snow, drought, population increase).
At Cle Elum Dam and Reservoir in Cle Elum, WA.
4/26/2018 BOR Photo by Kirsten Strough
B33-100-286
Yakima Project.
Construction worker digs with a shovel inside the secant at Cle Elum Dam. The secant is a very large oval-shaped hole that is stabilized by a concrete wall. It is being built in preparation to construct the Helix Fish Passage structure. The Yakima Basin Integrated Plan, which is a model for cooperative and sustainable water management in an area with shifting hydrologic conditions (more rain instead of snow, drought, population increase).
At Cle Elum Dam and Reservoir in Cle Elum, WA.
4/26/2018 BOR Photo by Kirsten Strough