BE33-100-6

Yakima Project.

 

Panoramic view of the secant at Cle Elum Dam. The secant is too large to capture from the ground even with an 18mm lens. The secant is a very large oval-shaped hole that is stabilized by a concrete wall. It is being built in preparation to construct the Helix Fish Passage structure. The Yakima Basin Integrated Plan, which is a model for cooperative and sustainable water management in an area with shifting hydrologic conditions (more rain instead of snow, drought, population increase).

 

At Cle Elum Dam and Reservoir in Cle Elum, WA.

 

4/26/2018 BOR Photo by Kirsten Strough